1.6m 2t 790- 850kg Electric Container Loading Machine Moving Loading Platform

Cellular loading system

The loading and unloading platform is a very common transportation way in the contemporary logistics. It is a bridge connecting the organization logistics chain, and also a loading and unloading procedure system for enterprises to swiftly and safely and securely transport the items and products. The height of the platform can not be modified, but the top of the carriages is various. There is often a specified peak variation or hole between the transportation motor vehicle and the loading and unloading system, which leads to the forklift to be unable to enter and exit the transport car to right load and unload the items.
The little mobile loading and unloading system can give a trustworthy link with the truck, so that the forklift can properly and quickly enter and exit the transport car for loading and unloading doing work. The product has the features of hassle-free unloading, strong steadiness and low upkeep expense, which is suitable for a variety of cars on loading and unloading web sites andplaces with reasonably hefty site visitors.

  

Design ZXPT16‐2
Maximum lifting top one.6m
Highest ability 2000kg
Platform dimension 2000*1675*800
Connection plate dimensions 1530*650
All round dimensions(L*W*H) 2155*2380*2570
Motor 380V/3kw(220V/two.2kw)
380V/3kw(optional 220V/2.2kw)
Lifting pace 5-6m/min
Tyre seven inch and 6 inch universal wheel
Oil cylinder sixty three/forty*two
Handle wi-fi remote handle
 
Chassis 60*one hundred twenty*5 rectangle pipe
fifty*a hundred*3.seventy five   rectangle pipe
Xihu (West Lake) Dis. 14B# U-bar
Weight 850kg
 

Actions:

one. Shift the mobile loading and unloading system to the aspect of the motor vehicle or platform that needs to load and unload goods, and make the side with the support roller shut to the motor vehicle or platform.
2. Modify the assistance roller of the loading and unloading platform and permit its height marginally reduce than the height of the car or system.
three. Rotate the assistance outrigger to make it help the equipment, and avoid the equipment from relocating by itself. If the support outrigger is not supported effectively, the gear is strictly prohibited.
4. Use the aviation plug outfitted with the tools to join the electricity line. For your protection, make sure you make certain that the equipment is reliably grounded.
(If 380V, we propose that you use nationwide normal copper wire over 1.5 square meters, if 220V, you would better use nationwide normal copper wire more than 1.five square meters.)
five. Up and down buttons on the distribution box can handle the ascending and descending motions of the desk, or use the geared up remote control to do the exact same procedure.

6.When the products powers off or malfunction occurs, the products can be lowered to the lowest position by way of the handbook descent button on the facet of the pump station to make certain protection.

 

Be aware:
The 380V item may reverse the motor because of to section sequence, outcome the products are unable to rise up.Then we require to alter the section sequence.

Notes:

1.When making use of the system, join the energy cable properly to stop electrical parts from burning out.
two. The support bar must be lowered when the equipment is working.
3.  The load potential must not exceed the rated load, and the load must be evenly dispersed on the platform surface. Do bear in mind CZPT partial load.
4.  The operator should know the efficiency and the procedure approach of the products.
five.  The temperature of working environment is from- 10 ° to fifty °.  32# hydraulic oil is utilised in winter season and forty six# hydraulic oil is utilized in summer. The oil need to be changed if the products is employed for much more than a thousand hours or 12 months.
6. Before utilizing, remember to keep in mind to check out regardless of whether all the fastened components are organization or not, regardless of whether the pipe link is reputable, whether the pipe is broken. To make confident that the electrical parts are doing work normally, the lubrication oil is adequate in the information way.
seven. The system ought to be lowered to the cheapest placement after completed employing.
eight. The gear has no watertight function. Do not get moist in the rain when storing outdoors.

1.6m 2t 790- 850kg Electric Container Loading Machine Moving Loading Platform